Extraordinary Genius

Chapter 810: Repair the dam (please ask for a ticket)

"Son, come back, are you cute?" Feng Xingtai asked with a smile.

Feng Yu "..." Oh, you raise such a small person, do you know?

"Dad, my grandfather?"

"Go down to the downstairs with your grandfather Li. I told you that children can be interesting, when you were young..."

Feng Yu certainly knows what Dad means, not just wanting him to get married soon, and then have a child. Fortunately, Feng Yu has already learned to play Tai Chi, once again smashing this topic.

"So, Dad, I heard that the farms have been repaired to Xingtai Eight Roads~ Street?"

Listening to this, Feng Xingtai immediately smiled and opened the flower: "Ah, hahaha, yes, let's spend so much money, they are of course faster. Unfortunately, the farm is so big, not many people, can't continue to repair it later. ""

"Dad, people who will continue to move to the farm in the future, the country has always said that building small towns. At that time, we will continue to repair. You can also repair the flower beds of the turntable, and you may be able to build a statue." ”

"Hey, what is the statue, your son is still not dead!"

"Then get a monument, the kind of written monument, you come to the inscription, this thing we have to build a solid, hundreds of thousands of years will not be bad."

"Oh, this is good, this is good, you have to hurry and get it. No, don't be too fast, I still have to practice calligraphy." Feng Xingtai was overjoyed. Just a little bit worried, he hasn't practiced a few days of writing.

"That tomorrow I will buy you a brush and rice paper, and then ask a person from the Provincial Calligraphers Association to guide."

When Feng Yu turned back, he smiled at the corner of his mouth. He tried to cultivate his brush and carefully cultivated his character. I have no time to take care of me.

......

"Feng Zong, your farm repair road has been completed? You are the road to prepare for the company's continuous company? But it is wide and long, the cost is not low." Li Jianyi of the provincial construction listened to Feng Yu to find the project The team, suddenly happy to open the flowers.

To work for Mr. Feng, there is no need to cut corners and work, and Feng’s engineering fees are high. And to ensure quality, completion and bonuses, unlike other owners, the price is obviously low, but also requires high quality, is that possible? I don’t know if I have a penny? If the owners are like Feng, they can save a lot of work.

“Do you have experience in building dykes in the province?”

"What to repair? The dam? You are going to repair the dam for your farm? It doesn't take too much trouble. It's not enough to dig the earth directly with the excavator. It works well, but it requires more construction machinery. I call it People go to budget.” Li’s heart is still awkward. How is Feng’s boss not my hometown? My hometown is still in the county. There is no spacious Feng’s farm on the street.

"I want to be able to survive the levees of the flood."

"Guar to be able to live."

"If you want to be able to withstand the levees of a flood in a hundred years, be wide enough, and the ones that can be opened to traffic, can't you?"

"Feng Zong, isn't it necessary? The project cost can be high. At least a stone masonry **** or concrete **** protection is needed. The one-meter dam is probably higher than the one-meter national highway." Li knows Feng. Yu is very rich, but it is not a small amount to build a dam.

"You have to get a budget first, and you can get one of several options, including the general dam renovation. I will look at it again. Also, my request is clear to you, the cost is not high, but if your construction does not reach Design requirements, don't blame me for turning my face."

“Feng always rest assured that although we are not good at designing dykes, we are squatting with the Water Conservancy Design Institute. They design, can we work without your construction?” Li’s heart is stunned, preferably concrete or stone masonry, so that they can There are more projects to do. This design has to be profited from the water conservancy.

"You look at it, I will give it to you. When it happens, I will find you."

"Feng always rest assured that we are not the first cooperation. We have done the work. When did we have problems?" Well, at least there was no problem with Feng.

......

"Xu Shu ~ remember, the province has any budget for water conservancy projects this year?"

Xu Changyou looked at Feng Yu very surprised: "What do you mean?"

"How much budget there is in the province, I donate one to one, I want to repair the dams in our province this year. Let's save this province, but the rainfall is getting bigger every few years. It is easy to be affected, I want to make a contribution." Feng Yu said with his arms.

“One to one donation, build a levee? Feng, is it better to change your donation? The levees in our province are good, and the funds are also repaired every year. It is no problem to resist flooding.” Xu Changyou said with some care. How much is the budget for repairing the dam? If Feng Yu can make a fortune to repair the road, the road network of Longjiang can be better.

Although Longjiang is a village-village, most of them are sand roads. If they are like the coastal provinces, they will become cement roads. After he retires, he will ensure that all Longjiang people can read his good.

Feng Yu has some helplessness. If it was not in 1998, Longjiang was one of the most affected provinces in the country. Will I donate so much?

I just want to have fewer people affected by the disaster and do more. There is also a donation in the two lakes. Does TM have to make a profit this year and give you a road repair?

"Xu Shu ~ remember, I am also required to repair this dam. I require all dams to be called storm dams, which is also related to the promotion of our company's brand. And the province must freely promote all our brands, this I don't want to ask for it. I am not interested in repairing roads."

Feng Yu wants to say that there is a catastrophic flood in the next year, and many places in Longjiang are flooded. Who is the letter? Whether it is smashing grain or repairing dykes, it is to resist the flood.

If there is no flood, Feng Yu will not be willing to repair any dam. How much is the donation of the building, it will soon surpass Mr. Shao, and the first good person in the future of Huaxia education, Taihua Building will go deep into the hearts of every student, this is A disguised idea is implanted.

In the future, everyone will be proud of the work of other companies in the Taihua brand. Of course, the old lady is also happy, and Feng Yu will be very happy.

"All the dams are called stormy dams? This is not very good? Many dams, we have already finished repairing." Xu Changyou was somewhat upset, saying that Feng Yu is famous, this is too much. Right?

"Wind and rain dam, the wind and rain will not fall, how good this is. Besides, I am really out of the real money, how can I not get a naming right? Those repaired dams, do not need to repair? If you are in this province this year The budget is one hundred million, and I will donate one billion. If you can get out one billion, I will sell the iron and give you a billion!"

Shabu-shabu selling iron? You Feng Da boss needs? But Xu Changyou understands that Feng Yu is determined to be very big. If the dam of the province is to be renovated and reinforced, it seems to be a good project for people's livelihood. Well, this thing has to be well understood with the water conservancy hall.

"Feng Zong, that is in front of the original name, plus the word rain and wind, and set up a sign, saying that this is your money to renovate, this line?"

"That's OK, but you don't have to get my name. It's made into wind and rain electronics, wind and rain. What do you think, feel free to contact me. After a year, I have to go abroad for business."

"How can this thing let you wait, I will give you an answer by the year."

After Feng Yu left, Xu Changyou immediately called the secretary in: "Notify Yang Liwen to come to me."