I Have a Little Black Hole

v2 Chapter 503: Tense and orderly preparations before la

   is like the country’s most important various engine projects, all of which have achieved breakthroughs because of the various high-performance materials provided by Infinite Gravity Group!

  All the'heart diseases' of various fighters and large airplanes have been cured! This alone has greatly increased the influence of Infinite Gravity Group!

   Not to mention the ‘peace couriers’. After using the new materials, not only the ammunition carrying capacity has become larger, but there is a qualitative breakthrough in flight speed and flexibility!

   It can bring ‘peace’ to the enemy faster, and break through the enemy’s defense network faster and more unstoppable!

   There are also various upgrading and transformation projects of nuclear submarines, all of which are related to various batteries and materials of the Infinite Gravity Group. All these influences are unknown to ordinary people, but they actually exist. Want-free-fee-read-end-full-version-please-100-degree-search-

These hidden influences are also one of the reasons why Infinite Gravity Group can successfully carry out various cooperation with the country. For example, the Hadron Collider Project, the Rocket Project, etc., are all green lighted all the way because of such influence. of.

   Not to mention the recently approved nuclear fusion energy development project. For a sensitive project such as nuclear fusion energy, if an ordinary company passes the application, the country will only treat you as a joke.

   After the Infinite Gravity Group applied for it, it immediately became a focus of attention, because the country knew that their company could indeed solve this problem.

   Such a large influence is the reason why the company has always been so emboldened. Everyone knows that as long as one does not die, the country is the company's biggest backing!

  Want to put pressure on Infinite Gravity Group? A source of confidence for the company's tough and domineering response is also provided by these influences.

   The company headquarters was not affected by this incident, and the employees of the company at the ‘Gaia’ rocket launch base on the South Island, which is thousands of miles away, would not be affected.

  They are going crazy during this time. Even if they know about the troubles in the company, they don't have the mood to pay attention to it. It is their task is too important.

   The two space telescopes and three synchronous orbiting satellites have all been transported to the launch base, where they will be tested for the final.

  Although the first-stage engines of the rocket have passed the launch test, if they are to meet the launch requirements again, a comprehensive test must be carried out.

Not to mention the two-stage rocket. There are also system tests after the integration of the two-stage rocket, such as the separation of the first- and second-stage rockets, the separation of the fairing, and the ignition of the second-stage rocket. They all have to undergo many simulation tests. of.

Of course, there are many other tests and monitoring tasks that need to be carried out simultaneously. To complete the successful launch of these five carriers into space according to the scheduled launch plan before the end of the year, there are too many things that need to be done. !

The launch preparation of a launch vehicle involves a wide range of areas, including launch vehicle inspection, testing, transfer, propellant filling, launch procedures and data calculation and binding, ignition launch, tracking measurement, safety control, measurement and control communications, ground service support And many other work.

  As you already know, the launch site of a carrier rocket is generally composed of major departments such as the technical preparation area, the launch area, the command and control center, the measurement and control communication system, and the ground service support system. When the launch vehicle was transported from the manufacturing plant to the launch site, the launch preparations of all departments began to fully start.

   The launch vehicle first enters the special plant in the technical preparation area. Here, the instruments and equipment on the arrows are individually tested to check their performance and accurately measure their parameters.

   After passing the unit test, the sub-system test is carried out. It is to check the coordination and function of the various instruments and equipment in the system when the system is in working condition, and to measure its working parameters. Then, a matching test is performed between the sub-systems to check whether the work between the systems is coordinated and matched.

   In the end, a general inspection involving all systems on the rocket is carried out. The general inspection is usually carried out many times to simulate various flight conditions to verify the technical performance and reliability of the entire system of the launch vehicle, and to make the rocket meet the requirements of the launch state.

   After the general inspection, various pyrotechnics and pyrotechnic devices were installed on the launch vehicle, and preparations were made for the transfer.

   While the launch vehicle and the spacecraft are undergoing technical testing, the measurement and control communication system in the launch site must undergo equipment joint testing. First, carry out joint test of equipment in the field, and then joint test with measurement and control stations, measurement and control centers, and measurement ships distributed throughout the country, even the world, and the ocean.

   At the same time, the ground service support department debugs the launch equipment and refueling equipment; the meteorological support department opens the weather information network and the weather consultation network, activates the weather measurement radar, and begins to make long-, medium-, and short-term weather forecasts.

  So much testing and preparation work has focused the company's attention during this period of time. As for the conflicts with companies and countries that covet the company's artificial intelligence system, UU read www.uukanshu. On the contrary, not many people follow com.

   After all, everyone knows that their company will never suffer from such a thing. Facts have also proved this. Instead of caring about this, it is better to care about the company's 5 rockets this time!

Xiong Antai of the Rocket Lab and Zhang Hanxiu of the Deep Space Lab were all nailed to the launch base during this period, and the people in the two laboratories had to stay to continue the experiment, and all the rest were pulled over. !

   This launch mission is the most important beginning of the company's space program. If all the payloads are successfully launched, it will prove that the company has mastered the rocket launch and recovery technology!

  This will be of great help to the company's heavy-duty launch vehicle and space station projects that the company is currently developing. At the very least, it can prove that the company really has the confidence to carry out so many projects!

   The reason why everyone is so nervous now is because this series of launch missions will be a solid cornerstone of the company's space program.

   If there is a problem with the launch, then the various space programs behind the company will inevitably be affected, which will make the company's researchers deeply hit!

   So now everyone at the ‘Gaia’ rocket launch base is 100% dedicated to these pre-launch testing and monitoring projects.

  Of course, because of the cooperation with the national aerospace department, there are also many experts from the aerospace department here to help. Their rich rocket launch experience is of great help to Infinite Gravity Group!

   I have a small black hole