Imperial Power Of Han Dynasty
Chapter 987: Zilong leads soldiers
Chapter 987
No one thought that Ma Chao was far better than Zhao Yun in terms of prestige and experience, but Liu Ye ordered Zhao Yun's general.
Especially Ma Chao, staring at Zhao Yun blushingly, unhappy.
When Liu Ye did this, he naturally had his in-depth consideration. Two generations of the Ma family have already established prestige in the Xiliang Army. Ma Teng, Ma Chao, Ma Xiu, Ma Tie and others are all important generals in the army, and they will definitely be formed in the future. A big family is arrogant and domineering and difficult to control.
Zhao Yun was born as a commoner, and there was no prominent figure in his ancestors. Such a person has no foundation, so he can use it with ease.
Before he knew it, Liu Ye's mind became deeper, and he was no longer just a warrior or a general.
In addition, Ma Chao is self-assertive, and it may be difficult to cooperate with Liu Bei, but Zhao Yun is humble and polite. He also fought with Gongsun Zan cavalry, so he should be able to adapt to this Huainan strategy.
Zhao Yun immediately led five thousand cavalry to the south and headed straight for Huainan.
Five thousand cavalry entered the territory of Jiujiang County from Zhongli, marching on the official road. Zhao Yun fought with Gongsun Zan back then, and of course he also had experience. He immediately ordered thirty sentry riders to cast a net on all sides and spread out ten miles away. Once a large army of horses approached, he would get news immediately.
Detecting outposts is very important for army operations, because ancient communications were backward and there was no radar, so people had to run. If you find the opponent in advance, you can quickly line up and make arrangements. If the opponent rushes to find out, it will inevitably be panic and chaos.
Tatata!
"General Zhao Lang! A Cao Jun food transport team was found to the east, with a number of about 800 people and several thousand people." A sentry rushed over and reported to Zhao Yun.
"Oh, well done."
Zhao Yun's eyes lit up, and he immediately ordered: "School 1 and School 2 come with me. Schools 3 and 4 respectively outflank the left and right to intercept the enemy's retreat!"
"Here!"
The five thousand cavalry groups were immediately mobilized. Zhao Yun personally led the two schools with two thousand five hundred cavalry to run forward, while the other two thousand five hundred cavalry were divided into two groups, outflanking left and right.
Tatata! Thousands of horses in black clothes and black armor, the horses and men charge like an angry dragon swept in, swallowing everything in front of them.
Soon, Cao Jun's food transport team came into sight. Except for the seven or eight hundred Cao soldiers in armor, the remaining thousands of people were all civilian men in commoners. Those Cao soldiers were okay, but when the people saw the menacing cavalry coming, they were all shocked.
"Carry... Cavalry?"
"No, run fast, you will die if you run late!"
"My mother."
These civilians were all forced to come by the Cao Jun. Seeing a large group of cavalry charging forward, their legs were so frightened that they were naturally unable to work for Cao Jun. They left their food and turned around.
"Don't go! Who let you go?"
"Damn it, stop, stop for me!"
Cao Jun Sima was naturally furious, shouting orders, and even hacked and killed several civilian husbands, but instead of stopping the civilian husbands, he ran farther out of fear.
Zhao Yun's eyes were cold, the gentian spear pointed forward, and the sound was like a huge thunder cutting through the sky.
"The whole army assault!"
"kill!"
The two thousand five hundred cavalry was like a sharp sharp knife, and it pierced into the army of eight hundred Cao. After a long opening. The speed was so fast that Cao Jun didn't feel the pain at first. He lowered his head and saw the blood oozing from the wound. The severe pain swept like a storm.
"Array, resist the array!"
Cao Junjun Sima is also a battlefield, knowing that on the plains, the infantry wants to counter the cavalry, the only way is to line up in place, resist the cavalry with the strength of the group, once dispersed, it is equivalent to a massacre.
Under the shout of Jun Sima, the Cao Jun around him gathered towards him, united around Jun Sima, and formed a strong formation.
Zhao Yun saw this scene from a distance, and immediately turned his horse's head and strangled away.
"Changshan Zhao Zilong is here, whoever blocks me will die!"
Buzzing!
The gentian bright silver gun swished and trembled, and instantly pierced into the heart and throat of several Cao Jun. The gentian gun was very sharp and had a blood slot on it. After inserting it, it was easy to pull out, but it flashed a piece. After the shadow, several Cao soldiers fell to the ground.
Zhao Yun fixed his gaze on Cao Junjun Sima, brandishing a gentian and bright silver spear, and rushing into it like a thorny thorn.
And Sima Cao Junjun also saw Zhao Yun, and said in his heart: This little white face should be the head of the enemy army. It should not be difficult to deal with his fine skin and tender flesh. If you kill him, you may be able to escape!
I don't know if Zhao Yun's appearance is good or bad, making Cao Junjun Sima also fall into the wrong judgment. In his impression, the fierce general should be someone like Zhang Fei, with a leopard head and eyes, a beard like steel needles, and a sound like a huge thunder.
"The enemy generals are going to be rampant, watch the sword!"
Cao Junjun Sima rushed forward and provoked from bottom to top with a single knife, trying to cut Zhao Yun in half.
However, his sword is fast, but Zhao Yun's gun is faster.
Puff! ,
"Well..."
The ring first knife stopped in the air, Cao Junjun Sima's movements stopped abruptly, the gentian gun had penetrated his heart, blood gurgled out of the wound, and strength flowed with the blood.
Zhao Yun pulled hard, and Cao Junjun Sima's body swayed and fell from the horse's back.
"Unbelievable, Jun Sima is dead!"
"Everyone, run for your life!"
When the army Sima died, Cao Jun's group of dragons had no leader, and naturally fled around, but of course Zhao Yun could not let them go, and immediately ordered the cavalry to attack everywhere. These Cao soldiers were two-legged, and naturally couldn't run the Xiliang cavalry. They were intercepted one after another, standing in one place with gray heads and faces.
"You, come out." Zhao Yun pointed at a Cao Jun's dub, and dub was scared and naturally stood up.
"This general...what's your order?" Dubo Cao Jun trembled.
"Go to Shouchun and tell Xiahoudun that you were intercepted by us."
"what?"
Uncle Cao Jun thought he had heard it wrong. Where did he intercept the grain and could not wait to inform the other party?
"Why, not willing?" Zhao Yun frowned.
"Willing, I will go now, I will go now!"
Uncle Cao Jun was afraid that Zhao Yun would stab him with a single shot, so he hurriedly agreed, riding the horse left by Cao Junjun's Sima, and galloping toward the west.
On the other hand, Zhao Yun instructed the remnants of Cao Jun: "You move all these grains and grass and bury them all for me!"