Maoshan Ghostbusters

Chapter 3266: Maintenance worker

Luffy frowned, "It seems that the construction site is really haunted."

The village chief smiled bitterly, "Is it really haunted? No one can tell, but the killing of three workers in a row is really evil. Moreover, these three workers are all given by steel pipes that slide down from a crane. It's smashed to death. So, if you ask people to ponder it carefully, it immediately feels creepy."

Lu Fei smiled, "Since all three workers were killed by steel pipes sliding down from the crane, it might be because the crane had a problem."

The village chief sighed, "I said young people, don’t think that the people on the construction site are all fools. A construction team has to have hundreds of people. This is still a relatively small project. Generally speaking, large projects have to have Thousands of people, or even tens of thousands, among so many people, is there no one smarter than your head? You said that there was a problem with the crane. People had already thought of it, and they called the crane manufacturer to repair it. After the second accident, the boss called the manufacturer’s personnel to overhaul the crane, but the manufacturer’s personnel had just completed the overhaul and proved that the crane had no problems and could be used normally. In this case, it was the manufacturer’s maintenance worker. Before leaving the construction site, a third accident occurred. It is said that at that time, the maintenance worker had just inspected the crane and patted his chest with the boss, saying that the quality of the crane was no problem at all, so feel free to use it. The boss listened to the inspection. As for the worker, a hanging mental arithmetic fell on the ground, but he was still a little worried, saying that while the maintenance worker was still there, he would just try to start the crane to see what the problem was. The worker who drove the crane. As soon as I heard that the crane had to be started, I was so scared that he quickly found an excuse to drive off. Also, twice in a row, he drove the crane and killed people. You said, where would he dare to drive the crane? Normal people, driving a crane to kill two people, let alone two, even if only one is killed, there must be a psychological shadow. The boss saw that the crane worker was running away, so he quickly found a worker and ordered the worker to drive. Crane, the worker is very young, he just turned eighteen, he is short and thin, and looks malnourished. Because the worker's surname is Li, they usually call him Xiaolizi, Xiaolizi usually It’s just that crane worker’s assistant. He rarely drives cranes. However, he has always been responsible for the cleaning and maintenance of cranes. The crane worker is his master, like car washing, wiping, and oiling of car parts. It was done by an apprentice. Although Xiaoli had never driven a crane, he could also drive. So at this moment, the boss called him over, and it was not a duck to the shelf. That Xiaoli was also a meticulous person, before getting on the crane , I deliberately inspected the steel pipes tied to the crane. I tried it with my hands to make sure that the bundles were very strong. Then I got on the crane with confidence. The boss was worried that there would be problems again, so he specifically asked the workers to clear the site, not allowing any workers to be near the crane. When everything was ready to stop, Xiao Lizi got into the cab and started the crane. The crane rumbling forward, shaking and humming the entire ground. The construction sites were all unfinished buildings, and Xiao Lizi drove the crane. Shuttle through the buildings, deliberately slow down the speed, wait for the crane to reach Building 10, and stop. According to the current construction schedule, the steel pipes in the crane should be unloaded here, but what makes Xiaoli depressed is There were a lot of waste materials piled up in front of Building 10, and these waste materials were piled up randomly, spread all over the floor, and there was no way to stop. In order to park the crane in the best position to facilitate unloading, I had to ask the boss to find someone to clean the ground. The boss Hurry up to greet the workers to clean up the clutter in front of Building 10. The workers have always been at their disposal, and as soon as they were ordered by the boss, they rushed over to help. Several workers were busy cleaning the ground with their heads down . The maintenance worker also joked with the boss. Look, isn’t it all right? Let me tell you that the quality of the cranes in our factory is awesome, and there has never been any quality problem. Let me tell you the truth, when the world's highest seven-star hotel was built, the local construction company came to China to order our factory's crane. What is the quality of our cranes? The boss was surprised, oh my god, isn’t the highest seven-star hotel in the world the Burj Al Arab hotel in Dubai? The maintenance worker smiled and said, yes, that's the hotel. They used our factory's crane to build the hotel. It was reported in the news. Didn't you watch the news? The boss shook his head. I'm so busy that I don't touch the ground every day. How can I have time to watch the news? The overhauler smiled and said, that was it. During that time, it was reported in the news every day. Because of that news, our factory's orders have increased a lot. The boss nodded absent-mindedly. Well, it seems that the quality of your cranes is indeed excellent. The maintenance workers run around between the various construction sites every day without problems, taking care of after-sales maintenance. They often deal with the boss, or the chief engineer of the project or the leader of the construction team. These maintenance workers are knowledgeable and have learned. Deal with customers and know what they like to listen to. In fact, sometimes after-sales service is also very important, and the machine will inevitably have some minor problems. If the maintenance workers are not smooth, it may cause the construction party to return or claim compensation, so the manufacturer is hiring maintenance workers. At the time, I will try my best to choose those who are slick and sophisticated, and will have troubles. At this time, the maintenance worker saw the boss relieved, so he continued to brag with the boss. Of course, to talk about it, the main theme is that the crane in their factory is okay, so feel free to use it. Invisibly, it is tantamount to implying that the reason why the crane killed the workers has nothing to do with their factory. The boss was drowsy as he listened to the overhauler’s remarks, almost his left ear went in and out of the right ear, completely lost in his mind. He has seen a lot of representatives sent by these manufacturers, all of them are sweethearted old slickers. If the representatives of the manufacturers are reliable, the sows can go up the tree. Moreover, the representatives of every manufacturer are the same. After receiving the payment, almost all of them are the shopkeepers. There is something wrong with the machine. If you call, the manufacturer specifies that there is no time and no people can be drawn. You have to wait for the manufacturer to come, at least three days or more, but when you work on the construction site, how can you wait for three days? Therefore, basically, when the people from the manufacturer came, they were arrogant. Many maintenance workers didn't even check the machine, but directly pushed on the workers, saying that the machine was caused by improper use. But this time, as soon as the boss called, the manufacturer immediately dispatched maintenance workers. After all, it was a life-threatening matter. This time, how dare they push for another three days. "