Military Technology

v2 Chapter 1919: Target: Tycho!

, the fastest update of the latest chapter of military technology!

Zhihai!

Wu Hao stared at the marked location on the big screen, then nodded at Shi Zhaoping and said, "It can be used as an important alternative to enter the final screening stage.

In addition, if necessary, the detection time of the "Wangshu" intelligent lunar surface inspection rover in Zhihai can be extended to collect and detect as much data as possible, so as to facilitate the subsequent site selection and the construction of the scientific research station and research projects. "

Shi Zhaoping nodded and said, "For now, Zhihai is indeed the best candidate, of course, there are better alternatives.

Therefore, we will appropriately extend the detection time of the "Wangshu" intelligent lunar surface inspection rover, and collect as much data as possible.

However, we do not recommend delaying for too long. This "Wangshu" intelligent lunar surface patrol rover still has its own mission.

So I suggest to screen several current candidate plans and jump out of the most suitable place, and then launch our second intelligent lunar exploration rover to conduct more detailed scientific exploration in the selected area. Prepare for the next step of scientific research station construction.

This "Wangshu" intelligent lunar surface inspection rover has limited detection capabilities, and more professional equipment is needed for more accurate detection. "

Yes, you can sort out a detailed plan as soon as possible, and then we invite experts and professors in related geology and planetary exploration to come over to discuss and screen together, and finally decide on the plan.

Speaking of this, Wu Hao asked Shi Zhaoping, "How is the development of our second intelligent lunar rover going?"

Hearing Wu Hao's question, Shi Zhaoping replied with a smile: "It's going very smoothly. Our second intelligent lunar exploration rover is actually based on the technical foundation of the first 'Wangshu' intelligent lunar surface inspection rover." It was developed on the ground, and what it uses is the sister backup vehicle of the "Wangshu" intelligent lunar surface inspection vehicle.

Therefore, there is no need to change the large platform system framework, only to replace and add new equipment and instruments. At present, the overall development work is progressing very smoothly, and it is expected to be successfully developed in two months. If it is possible, there should be no problem with the launch this fall. "

After listening to Shi Zhaoping's introduction, Wu Hao showed a satisfied expression, then nodded with a smile and said: "Then work harder, let's try to send this car to the moon in autumn.

Our lunar scientific research station project has attracted a lot of interest from many organizations and individuals, so next, this will also become a focus of our work.

But before that, our commercial space station project must be completed first. "

Hearing Wu Hao mentioning the commercial space station, Shi Zhaoping couldn't help but emotionally said: "How is the commercial space station project over there? Last time I went there, they had already developed the core cabin frame system."

Shi Zhaoping belongs to the lunar exploration project, while the commercial space station is an independent project, which is juxtaposed with the manned spaceflight project. Although they all belong to Haoyu Aerospace, he doesn't know much about the things there. On the one hand, because he is too busy with work, he has no spare time to pay attention to those. On the other hand, there are also issues of confidentiality involved.

Wu Hao smiled and nodded and said: "The progress is relatively smooth. At present, the relevant technologies of the core cabin have been overcome, and the next stage is the steady advancement stage. If everything goes well, we may launch our next winter or next summer. The core module of the first commercial space station, and then use a year to launch two more rockets to complete the T-shaped basic configuration of the entire commercial space station, and then gradually improve and expand the space station as needed to make it a complete form .”

Shi Zhaoping nodded with a smile and said happily: "This is really great. The inflatable expandable space capsule in the commercial space station is the main technology used in the construction of our scientific research station. Only after this technology is fully verified , Our lunar scientific research station will not have problems during construction and use.

Moreover, the subsequent manned moon landing also requires the cooperation of our entire manned spaceflight system, including the space station. Therefore, its success or failure directly determines the progress of our scientific research station project. "

Rest assured, this technology is well proven and will work without issue. The reason why Wu Hao said this is that the space oasis inflatable inflatable space experiment capsule they launched before performed perfectly, so he is very confident about it.

Seeing what Wu Hao said, Shi Zhaoping also nodded and smiled.

Next, how will this "Wangshu" intelligent lunar surface inspection rover go? Wu Hao then changed the subject with a smile, and refocused his attention on the lunar satellite map on the big screen.

Hearing Wu Hao's question, Shi Zhaoping replied with a smile: "After the 'Wangshu' intelligent lunar surface inspection rover completes the relevant exploration tasks of Zhihai, it will go south all the way and pass the Herigonius crater. , through Agatakides, and then enter the Wet Sea, and explore a series of craters such as Gassendi on the north side of the Wet Sea, focusing on finding water resources here.

And according to the detection results, stay here for a long time, and strive to complete the detection of the water resources of the entire wet sea, then enter the plague marsh from the southeast of the wet sea, and then find a suitable route to the Tycho crater near the lunar Antarctic Circle.

This is one of the two most famous craters on the moon, which is as famous as the Copernicus crater. The size of the Tycho crater is about the same as the Copernicus crater, but the impact power is indeed It is far larger than the Copernicus crater, and the radiation range of its impact explosion has even reached the Jiuhai crater, which is almost located on the moon's equator. It can be said to be very terrifying.

We hope to find new material elements here. It is possible that the six new element materials we launched in and around the Copernicus crater will also be found here, and there are abundant reserves.

In this way, it is definitely great news for our future commercial development of the moon.

After detecting Tycho, the "Wangshu" intelligent lunar surface inspection rover may start to find a route to see if it can go around the back of the moon. "

Why not reach the South Pole of the Moon? Zou Xiaodong, who had been silent all this time, interrupted and asked.

Hehe, Shi Zhaoping explained to Zou Xiaodong with a smile: "The topography of the South Pole of the moon, including the environment, is very harsh, and this 'Wangshu' intelligent lunar surface inspection rover may not be able to bear it.

So when we get to Tycho, we do an assessment and get as close as possible if we can. If it doesn't work, then you can only go around, after all, safety is the priority. "