Take Off My Aviation Era

Chapter 990: 0 emissions

What will happen if the thermal efficiency of China's industrial gas turbine reaches the level of the United States and Germany?

The most direct impact is that China is able to build a considerable number of underground abandoned mines and air energy storage power stations in the Yangtze River Delta. It is important to know that there are a considerable number of underground salt mines in the Yangtze River Delta. Due to the mild chemical nature of salt and its tightness It is an excellent construction site for air energy storage power stations in abandoned underground mines.

Because of this, if it can be fully utilized, it will not only solve the current problem of power shortage in the Yangtze River Delta, but from a long-term development perspective, it will also conform to the strategic plan for the comprehensive development of the Yangtze River Delta in the future.

Of course, more importantly, domestic industrial gas turbines represented by Ascendas Group will use the construction and commissioning of a series of air energy storage power stations to make industrial gas turbines more mature and reliable.

When the domestic air energy storage power plant industry chain is complete and the standards are mature, with the bloodthirsty expansion of Genghis Khan of the Ascendas Group, can we watch the core equipment of the international air energy storage power plant be monopolized by Germany's Siemens and the United States' GE?

It will inevitably take out the nature of a price butcher and set off a more brutal **** storm in the larger international market.

It is precisely by realizing this that Miles will be nervous, lose his temper, be afraid, and even have uncontrollable fear deep in her heart.

No way, China's size and system advantages of the nationwide system lie here, which leads companies like Ascendas Group to have sufficient market space and specific project experience, mass production, and cost reduction.

When the experience value of this water is held in your hand, it is equivalent to holding a king bomb, which can completely kill the Quartet.

On the other hand, although the United States and Germany have a monopoly in this regard, they lack enough room for experience. Needless to say, Germany is a small country and needs the support of the whole of Europe to maintain it. The problem is that Europe is not an independent sovereign state. , The interior is like a pile of dregs. In addition, the asking price in Germany is expensive to go to my grandmother's house. There are also constraints in Britain and France, even if you want to brush it, you can't brush it.

The United States has the ability to single-handedly, but since the end of the Cold War, the United States has begun to burst into various forms. The American consortium that thinks it can rule the world has begun to accelerate industrial transfer, leading to the acceleration of domestic industrial hollowing.

Coupled with the rise of left-wing ideology and the establishment of a role model, the domestic labor costs, land costs, and material costs in the United States have risen. This has promoted the profitability of Wall Street capital on the one hand, but on the other hand, it has also curbed. The development of manufacturing industry.

Under such circumstances, the U.S.'s single-scaling capacity has plummeted. If it weren’t for this, the giants represented by GE would not be able to value emerging economies such as China as much. In addition to grabbing excess profits, more importantly, they can also use their experience. The little guinea mouse can kill two birds with one stone.

It’s good now. Ascendas Group has a big move directly. GE’s industrial gas turbine business in China is precarious. If no measures are taken, it will not take long. GE’s global gas turbine share may also be swallowed by Ascendas Group. Eight.

Because of this, after making Wei Hui's pen-chittering dog speechless, Miles stopped paying attention and turned to Cai Weiguo: "Cai Gong, how many leaders do you know from the Yangtze River Delta? "

"A few can still speak." Cai Weiguo did not hide it.

"Then please contact me these few days. I will invite them to have a meal and talk about GE's unique advantages in the air energy storage power station." Miles directly stated his plan: "rest assured, our plan is definitely better than Ascendas Group’s is even 10% lower. As long as these local leaders are willing, I can even provide a full set of American-made equipment."

"That's great!" As soon as Cai Weiguo heard that his son-in-law was making such a large sum of money, he immediately patted his chest. "Don't worry, just aim for a full set of American-made equipment. I want GE products on the pole, and they are still more positive than one. If not, I will write it backwards!"

"Okay, as long as you can help me do it, you will have to thank you after it is done!" Miles was very satisfied with Cai Weiguo's attitude. After casually writing a blank check, a pair of dark blue eyes suddenly narrowed and stared at the TV. The middle-aged man wearing an engineering hat who was being interviewed unconsciously twitched his mouth: "It's actually Cao Jiefang!"

Upon hearing the three words of Cao Jiefang, Cai Weiguo immediately looked back with the cat that had stepped on its tail. It turned out that it was Cao Jiefang who was interviewing by the foreign reporter in the focus interview on TV. He immediately felt like he had met his enemy, cold snort. A cry: "I didn't expect that he could still..."

"Shut up!" Before Cai Weiguo finished speaking, Miles stopped.

Cai Weiguo was a grievance, but Miles didn't have the time to deal with him, because he was staring at the picture on the TV at this moment.

"You just said that the air energy storage power station under construction has achieved true zero emissions?" The reporter may.

"Yes, this is an amazing miracle created by our Ascendas Group and the scientific research team of Professor Li Tong. It is also the first Chinese standard we have formulated in the field of new energy, which is stricter than that of Europe and the United States. Emissions, 100% environmentally friendly clean air energy storage power station standards." Cao Jiefang wears an engineering hat and looks polite in front of the camera, but what he says is loud and loud.

"So, this 800,000 kilowatt air energy storage power station has reached the world's leading standard?" The reporter seemed a little excited?

"No!" Cao Jiefang shook his head modestly: "It can only be said to be second in the world."

"Which is the number one in the world?" The reporter pursued.

"It is our next 3 million kilowatt air energy storage power station to be built on the Changzhou Jinshan Salt Mine~lightnovelpub.net~ Cao Jiefang's face is full of proud afterglow: "And as we take off the group and Professor Li Tong The team’s more in-depth research will lead to more rapid technological progress. The most advanced will always be the next one. This is where our Ascendas Group and Professor Li Tong’s team continue to work hard. After all, the kind of domestic technology that crushes foreign countries The feeling of technology is really wonderful! "

"Then can we see how the entire air energy storage power station works and how to achieve zero emissions?" The reporter changed the subject.

"No question!" Cao Jiefang led the reporter to an exhibition room without any hesitation, then pointed to a set of miniature models with flashing lights and introduced:

"In fact, the principle we applied is very simple. As long as you have studied physics in middle school, you will know that the work done by compressed air will be accompanied by heat generation. When a lot of air is compressed, the heat will be quite high. Siemens and GE in the United States have air energy storage. The power station uses the heat of compressed air to ignite natural gas and at the same time provide combustion, and then promote the operation of the gas turbine to generate electricity. The fundamental issue is fossil fuel power generation, and there is no fundamental problem.

The plan proposed by our Ascendas Group and Professor Li’s team is to set up a heat conversion device to transfer the heat of the compressed air to the device. When the air is released, the heat is used to heat the air to directly drive the gas turbine to run, thereby driving the generator to generate electricity. From the beginning to the end, no drop of fossil fuel was used, and zero emissions were truly achieved. "

"Bang~~~ Wow~~~"

As soon as Cao Jiefang finished this introduction, Miles swept the plate in front of him to the ground, and at the same time roared at the TV: "Cao Jiefang is lying, he is lying, lying..."

https://

Genius remembers this site address in one second:. Mobile version reading URL: