The Engineering Boss

Chapter 120: Restoration of canals and ditch

"Hey, Tian Hu, my house slaughtered pigs on the 18th, and I had time to bring sister Zhong to my house for slaughter pig rice that day!"

  

   "Hey, Boss Zhou, my house slaughtered pigs on the 18th. I have time to bring my family to my house for slaughter pig rice that day!"

  

   "Hey, Boss Liu, my house slaughtered pigs on the 18th. I have time to bring my family to my house for slaughter pig rice that day!"

  

  ...

  

   Chen Yang sent Hu Xiaojun to the Taiping Reservoir and then returned to the hotel. In the hotel, Chen Yang called people he knew and invited them to eat pig-killing rice at his house on the 18th.

  

   "I would like to ask, I am afraid that this year I will cook a few more tables for the pig-killing rice!"

  

   It is roughly estimated that there will be two more people at the table than in previous years. Chen Yang would like to invite them to a meal, thanking them for their help and care, but he has not found the right time.

  

   Now Chen Yang’s idea is to use his family’s pig-killing days to entertain everyone and increase their feelings. At the same time, he hopes that cooperation with them will be smooth sailing in the future.

  

   At eight o'clock in the evening, Chen Yang, who was lying on the bed and reading the novel, received a call from Tian Hu.

  

"Hey, Chen Yang, Xu Kai, the owner of the commercial mixing station, just called me back. Liu Kai has investigated the matter of the wrong amount of concrete. He has reduced 20 cubic meters of concrete for you. What do you think?" Tian Hu said on the phone.

  

   Chen Yang thought for a while. This time, the concrete poured this time is more than 20 cubic meters more than the actual calculation. If you subtract 20 cubic meters of concrete for yourself, it just matches the volume calculated by yourself.

  

   "Yes! By the way, didn't I ask you to make an appointment with him? Did you make an appointment?" Chen Yang asked.

  

"Why no appointment! The key is that people don't have time recently. Xu Kai said that he was busy in the city recently to re-establish a merchant station. I don't know when he will come to Ninghui County, or we will go to the city to meet him another day. What do you think?" Tian Hu asked Chen Yang for his opinion.

  

   Go to the city to meet him?

  

   "I'm going to the city only when I have time. Alright, remember to take Sister Zhong to my house for pig-killing rice on the 18th." Chen Yang exhorted at last.

  

   "I see, I will also come back home to take a look!"

  

   On January 16, the weather was overcast.

  

   The engineering-special leather car awarded by the project has been sent to the vicinity of the county passenger terminal. Chen Yang directly called the on-site administrator of the No. 1 Middle School to take the leather away by car.

  

   And Chen Yang’s arrangement today is to first go to the rescue project to take a look, and buy something to take care of the injured Sun Zhengkui’s house, then go to the First Middle School and Taiping Reservoir, and take some money to Liangzi Township when he is late.

  

   Regarding the question of what to eat for comminuted fractures, Chen Yang has found a lot of nutritional products on the Internet. Because there are too many online, Chen Yang does not know what to buy.

  

   So in the end, Chen Yang went directly to the pharmacy to ask the doctor. At the doctor's suggestion, Chen Yang bought a supplement for almost 600 yuan and went to Sun Zhengkui's house.

  

Sun Zhengkui’s family didn’t expect Chen Yang to come. In his family’s opinion, Chen Yang might leave them unattended after giving them a thousand dollars. Yang's view suddenly changed.

  

  Chen Yang naturally wouldn't know this. He left after spending half an hour with Sun Zhengkui, and arrived at the rescue construction site within a few minutes.

  

   More than half of the formwork on the last floor of the site has been supported. It looks like this may be able to support the Wucang formwork on the last floor today, and the concrete can be poured tomorrow.

  

"Boss, the progress is a bit slow due to the rain yesterday, otherwise the formwork can be supported this morning." The junior manager explained the reason to Chen Yang, "Boss, is the remaining part of the retaining wall that has not been excavated now? Can it be excavated? My idea is to excavate all the remaining foundation and pour it together with the warehouses on which the formwork is installed. This can save a large part of the time."

  

   The segmented excavation method was used to excavate the retaining wall. Now that part of the excavation has been excavated, most of the concrete has been poured, and the remaining part has not been moved.

  

Chen Yang looked at it and said, "Yes, transfer the excavator over to excavate the remaining foundation of the retaining wall. You personally direct the excavator master to excavate, and don't let the excavator touch the concrete we just poured. One point, pay attention to safety!"

  

   "Okay, boss! I will arrange the excavator to excavate immediately."

  

Chen Yang didn’t know when the drawing of the anchor cable frame beam came out. The retaining wall was almost half completed. The retaining wall was basically completed in one week. At that time, he was waiting for the **** protection. The anchor cable sash beam is out.

  

   "I wonder if Boss Zhou is going to ask for the project money?"

  

   A few days ago, Chen Yang heard Zhou Xinjin say that after pouring a few warehouses on the retaining wall, he would get some project money back. Now that the retaining wall has been poured so much, Zhou Xinjin has not told him about the project money.

  

   When he was about to leave the rescue project construction site, Zhou Xinjin brought a group of people to the scene. At a glance, there were probably fifteen or six people.

  

The person headed by    is Deputy Mayor Sun, Zhou Xinjin is accompanied on the left, and behind them there are some followers who Chen Yang doesn't know.

  

   "Chen Yang, it’s quite early to come to the construction site today!" Zhou Xinjin saw Chen Yang and walked towards Chen Yang quickly, "Have you seen the injured worker?"

  

   "I just bought some supplements and went to see it, there should be no big problem, wait for him to recover slowly!" Chen Yang responded, "Boss Zhou~lightnovelpub.net~ Are you here today?"

  

   It's impossible to see the formation in front of you just to look at the retaining wall, perhaps to look at the **** protection above the retaining wall.

  

"Didn't the landslide break the big ditch above? This big ditch is related to the draught and irrigation problems of the following villages. Now the following villages are already in trouble, so it is necessary to restore the big ditch as soon as possible. Water, if it doesn’t, the fruit is a bit serious."

  

   "Today, Deputy Mayor Sun brought the design and geological survey and they came to see the situation on the scene and see how to restore the canal and ditch. I hope to come up with a plan as soon as possible."

  

   turns out to be for this!

  

   The canal ditch is in the area above the landslide. At present, a distance of tens of meters has been interrupted by the landslide. It is quite difficult to connect the two canal ditch.

  

The main reason is that if a new canal is built to connect the two sections of the original canal, a new canal must be excavated in the landslide section. This will definitely have a certain impact on the mountain. If it causes a landslide again, the consequences will be... .

  

  Who will do this job even after taking out the plan?

  

   "Boss Zhou, are we still doing the job of restoring the canal and big ditch?" Chen Yang asked.

  

   "We should do it. But it's not certain now, after all, we still have so much work to do. However, if you have extra time, I can help you do this work next."

  

   "Let's talk about the design plan when the time comes!"